MDA CHORUS combines the operating RADARSAT-2 asset with planned C-band and X-band SAR satellites. On September 16, 2026, MDA introduced COMMAND for archive access, planning and tasking, COMMAND PRO for a customer-integrated regional ground station, and INTELLIGENCE for geospatial analytics. The new satellites remain scheduled for launch in late 2026. The advertised 700 km broad-area swath and sub-metre spotlight resolution describe different imaging modes, not simultaneous performance from one acquisition.
Technical detail
Core features
COMMAND archive, tasking and API access
COMMAND PRO regional downlink and local processing
INTELLIGENCE maritime and infrastructure analytics
Planned C-band and X-band expansion alongside RADARSAT-2
Space
Earth Observation
Synthetic Aperture Radar
Maritime
Chorus
C Band Sar
X Band Sar
Tip And Cue
Use & integration
Recorded applications
Arctic domain awareness
Maritime monitoring
Distributed sensor fusion
Wide-area Arctic and maritime change detection
Rapid cueing from broad surveillance to higher-resolution collection
These describe the reviewed application scope, not confirmed deployments, released requirements or procurement eligibility.
Evidence of maturity
Product portfolio announced September 2026; RADARSAT-2 is in orbit, while the two new spacecraft remain pre-launch. Product introduction and ground-facility readiness do not establish completed constellation operations.
Commercial availability
Customer engagement and planned access are marketed through MDA. Confirm which data sources are operating, delivery dates, imaging modes, tasking rights and ground-station requirements.
Integration and verification
Readiness
A technology readiness level is not established by the reviewed public sources.
MDA CHORUS Synthetic Aperture Radar Constellation may help teams working on Future submarine operational capability by contributing to maritime and undersea operations, Arctic and northern operations, and detection and situational awareness.
This is a reviewed public-source assessment. It is not procurement eligibility, endorsement, customer interest, or classified demand.
Original sources 4 linked records
These records support this capability and its published Mission area and Defence need connections. A source count is not a count of independent confirmations.
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · technical tags
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · capability type
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · technology readiness level
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · defence applications
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · technical tags
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · technical tags
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · defence applications
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · summary
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · name
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · technical tags
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · core features
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · commercial availability
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · defence applications
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · defence applications
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · technical tags
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · technical tags
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · core features
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · technical tags
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · maturity
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · core features
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · technical tags
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · technicaldomainslugs
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Capability · technicaldomainslugs
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Mission area · Arctic Domain Awareness
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Mission area · Arctic Domain Awareness
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Mission area · Arctic Domain Awareness
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
Supports: Mission area · Arctic Domain Awareness
September16 2026 MDA introduces CHORUS COMMAND tasking/archive/API access, COMMAND PRO regional ground stations/downlink/local processing, and INTELLIGENCE analytics. New C/X-band satellites remain scheduled for late2026 launch; RADARSAT-2 is already in orbit. Product announcement and control-centre opening are readiness milestones, not completed new-satellite operations.
CHORUS combines existing RADARSAT-2 with planned C-band and X-band satellites using broad-area monitoring and follow-up high-resolution imaging; marketed700km swath and sub-metre spotlight are different imaging modes. New constellation expansion is planned for late2026, not yet launched.
Supports: Capability · summary
CHORUS combines existing RADARSAT-2 with planned C-band and X-band satellites using broad-area monitoring and follow-up high-resolution imaging; marketed700km swath and sub-metre spotlight are different imaging modes. New constellation expansion is planned for late2026, not yet launched.
The CHORUS page describes a next-generation Earth observation constellation using C-band and X-band synthetic aperture radar.
Supports: Capability · update child
CHORUS is described as pairing C- and X-band SAR in the same orbit and ground track, with coverage up to 700 km, sub-metre imaging, tipping-and-cueing, and rapid tasking for all-weather observation.
Supports: Mission area · Arctic Domain Awareness
Source location: Product overview
The CHORUS page describes a next-generation Earth observation constellation using C-band and X-band synthetic aperture radar.
Supports: Defence need · Future submarine operational capability
Canada identifies long range, long endurance, under-ice operation, surveillance, deterrence, Arctic, Atlantic, and Pacific missions as public capability needs for the future fleet.
Public sources cited · Facts and assessments kept separate · Human review
CHORUS combines existing RADARSAT-2 with planned C-band and X-band satellites using broad-area monitoring and follow-up high-resolution imaging; marketed700km swath and sub-metre spotlight are different imaging modes. New constellation expansion is planned for late2026, not yet launched.
Supports: Capability · core features
CHORUS combines existing RADARSAT-2 with planned C-band and X-band satellites using broad-area monitoring and follow-up high-resolution imaging; marketed700km swath and sub-metre spotlight are different imaging modes. New constellation expansion is planned for late2026, not yet launched.
Supports: Defence need · Future submarine operational capability
Source location: Product overview
The CHORUS page describes a next-generation Earth observation constellation using C-band and X-band synthetic aperture radar.