Seaspan Vancouver Shipyards is building two Protecteur-class Joint Support Ships for the Royal Canadian Navy, integrating underway replenishment, helicopter support, medical facilities and limited sealift. The construction programme supports sustained naval task-group operations; delivery and operational acceptance are separate milestones.
Technical detail
Core features
Replenishment-at-sea systems
Flight deck and hangar integration
Command and medical facilities
Joint Support Ship
Naval Logistics
Shipbuilding
Use & integration
Recorded applications
Task-group sustainment
Humanitarian assistance
Global naval deployment
These describe the reviewed application scope, not confirmed deployments, released requirements or procurement eligibility.
Evidence of maturity
First ship launched in December 2024; second structurally consolidated in April 2026. DND plans Protecteur delivery in June 2027 and Preserver in 2027/2028.
Commercial availability
Contracted Canadian naval construction programme; operational trials follow delivery. The government schedule reflects first-of-class outfitting delays.
Integration and verification
Readiness
A technology readiness level is not established by the reviewed public sources.
Reviewed connections
No reviewed Mission area or released Defence need connection is currently published.
Original sources 2 linked records
These records support this capability and its published Mission area and Defence need connections. A source count is not a count of independent confirmations.
DND identifies Vancouver Shipyards as builder of two Protecteur-class JSS. Protecteur delivery is planned for June 2027 followed by operational trials; Preserver for 2027/2028. The second ship was structurally consolidated in April 2026. Functions include replenishment, helicopter support, medical facilities and limited sealift. First-of-class outfitting challenges delayed the first delivery from 2026 to 2027.
Supports: Capability · technical tags
DND identifies Vancouver Shipyards as builder of two Protecteur-class JSS. Protecteur delivery is planned for June 2027 followed by operational trials; Preserver for 2027/2028. The second ship was structurally consolidated in April 2026. Functions include replenishment, helicopter support, medical facilities and limited sealift. First-of-class outfitting challenges delayed the first delivery from 2026 to 2027.
Supports: Capability · technical tags
DND identifies Vancouver Shipyards as builder of two Protecteur-class JSS. Protecteur delivery is planned for June 2027 followed by operational trials; Preserver for 2027/2028. The second ship was structurally consolidated in April 2026. Functions include replenishment, helicopter support, medical facilities and limited sealift. First-of-class outfitting challenges delayed the first delivery from 2026 to 2027.
Supports: Capability · commercial availability
DND identifies Vancouver Shipyards as builder of two Protecteur-class JSS. Protecteur delivery is planned for June 2027 followed by operational trials; Preserver for 2027/2028. The second ship was structurally consolidated in April 2026. Functions include replenishment, helicopter support, medical facilities and limited sealift. First-of-class outfitting challenges delayed the first delivery from 2026 to 2027.
Supports: Capability · technicaldomainslugs
DND identifies Vancouver Shipyards as builder of two Protecteur-class JSS. Protecteur delivery is planned for June 2027 followed by operational trials; Preserver for 2027/2028. The second ship was structurally consolidated in April 2026. Functions include replenishment, helicopter support, medical facilities and limited sealift. First-of-class outfitting challenges delayed the first delivery from 2026 to 2027.
Supports: Capability · defence applications
DND identifies Vancouver Shipyards as builder of two Protecteur-class JSS. Protecteur delivery is planned for June 2027 followed by operational trials; Preserver for 2027/2028. The second ship was structurally consolidated in April 2026. Functions include replenishment, helicopter support, medical facilities and limited sealift. First-of-class outfitting challenges delayed the first delivery from 2026 to 2027.
Supports: Capability · maturity
DND identifies Vancouver Shipyards as builder of two Protecteur-class JSS. Protecteur delivery is planned for June 2027 followed by operational trials; Preserver for 2027/2028. The second ship was structurally consolidated in April 2026. Functions include replenishment, helicopter support, medical facilities and limited sealift. First-of-class outfitting challenges delayed the first delivery from 2026 to 2027.
Supports: Capability · defence applications
DND identifies Vancouver Shipyards as builder of two Protecteur-class JSS. Protecteur delivery is planned for June 2027 followed by operational trials; Preserver for 2027/2028. The second ship was structurally consolidated in April 2026. Functions include replenishment, helicopter support, medical facilities and limited sealift. First-of-class outfitting challenges delayed the first delivery from 2026 to 2027.
Supports: Capability · technicaldomainslugs
DND identifies Vancouver Shipyards as builder of two Protecteur-class JSS. Protecteur delivery is planned for June 2027 followed by operational trials; Preserver for 2027/2028. The second ship was structurally consolidated in April 2026. Functions include replenishment, helicopter support, medical facilities and limited sealift. First-of-class outfitting challenges delayed the first delivery from 2026 to 2027.
Supports: Capability · technicaldomainslugs
DND identifies Vancouver Shipyards as builder of two Protecteur-class JSS. Protecteur delivery is planned for June 2027 followed by operational trials; Preserver for 2027/2028. The second ship was structurally consolidated in April 2026. Functions include replenishment, helicopter support, medical facilities and limited sealift. First-of-class outfitting challenges delayed the first delivery from 2026 to 2027.
Supports: Capability · technology readiness level
DND identifies Vancouver Shipyards as builder of two Protecteur-class JSS. Protecteur delivery is planned for June 2027 followed by operational trials; Preserver for 2027/2028. The second ship was structurally consolidated in April 2026. Functions include replenishment, helicopter support, medical facilities and limited sealift. First-of-class outfitting challenges delayed the first delivery from 2026 to 2027.
Supports: Capability · core features
DND identifies Vancouver Shipyards as builder of two Protecteur-class JSS. Protecteur delivery is planned for June 2027 followed by operational trials; Preserver for 2027/2028. The second ship was structurally consolidated in April 2026. Functions include replenishment, helicopter support, medical facilities and limited sealift. First-of-class outfitting challenges delayed the first delivery from 2026 to 2027.
Supports: Capability · defence applications
DND identifies Vancouver Shipyards as builder of two Protecteur-class JSS. Protecteur delivery is planned for June 2027 followed by operational trials; Preserver for 2027/2028. The second ship was structurally consolidated in April 2026. Functions include replenishment, helicopter support, medical facilities and limited sealift. First-of-class outfitting challenges delayed the first delivery from 2026 to 2027.
Supports: Capability · technical tags
DND identifies Vancouver Shipyards as builder of two Protecteur-class JSS. Protecteur delivery is planned for June 2027 followed by operational trials; Preserver for 2027/2028. The second ship was structurally consolidated in April 2026. Functions include replenishment, helicopter support, medical facilities and limited sealift. First-of-class outfitting challenges delayed the first delivery from 2026 to 2027.
Supports: Capability · name
DND identifies Vancouver Shipyards as builder of two Protecteur-class JSS. Protecteur delivery is planned for June 2027 followed by operational trials; Preserver for 2027/2028. The second ship was structurally consolidated in April 2026. Functions include replenishment, helicopter support, medical facilities and limited sealift. First-of-class outfitting challenges delayed the first delivery from 2026 to 2027.
Supports: Capability · core features
DND identifies Vancouver Shipyards as builder of two Protecteur-class JSS. Protecteur delivery is planned for June 2027 followed by operational trials; Preserver for 2027/2028. The second ship was structurally consolidated in April 2026. Functions include replenishment, helicopter support, medical facilities and limited sealift. First-of-class outfitting challenges delayed the first delivery from 2026 to 2027.
Supports: Capability · capability type
DND identifies Vancouver Shipyards as builder of two Protecteur-class JSS. Protecteur delivery is planned for June 2027 followed by operational trials; Preserver for 2027/2028. The second ship was structurally consolidated in April 2026. Functions include replenishment, helicopter support, medical facilities and limited sealift. First-of-class outfitting challenges delayed the first delivery from 2026 to 2027.
Supports: Capability · summary
DND identifies Vancouver Shipyards as builder of two Protecteur-class JSS. Protecteur delivery is planned for June 2027 followed by operational trials; Preserver for 2027/2028. The second ship was structurally consolidated in April 2026. Functions include replenishment, helicopter support, medical facilities and limited sealift. First-of-class outfitting challenges delayed the first delivery from 2026 to 2027.
The cited official portfolio material supports the Joint Support Ship construction capability family and its described delivery scope; product and platform availability remains configuration-dependent.
Public sources cited · Facts and assessments kept separate · Human review